City of Aurora Development Application Review

My Account


User Guides

FINE PARKING - MASTER PLAN AMENDMENT | Need Final Mylars
Type Phase Title Date Resubmit View
Case Files - 2nd Technical Review Comments Need Final Mylars2nd Technical Review Comments1/4/2024
Site Plan - Cut SheetsNeed Tech SubmTab 14 ALTA Survey12/14/2023
Master Plan - Traffic Impact StudyNeed Tech SubmMTIS12/14/2023
Site Plans - Trash EnclosuresNeed Tech SubmMUS Water Exhibit12/14/2023
Site Plans - Sign PlansNeed Tech SubmMUS Water Exhibit12/14/2023
Site Plans - Fence PlansNeed Tech SubmMUS Sewer Exhibit12/14/2023
Site Plans - Colored RenderingsNeed Tech SubmMUS Sewer Exhibit12/14/2023
Site Plans - Alta SurveyNeed Tech SubmMaster Utility Study12/14/2023
Master Plan - Master Utilities PlanNeed Tech SubmMaster Utility Study12/14/2023
Master Plan - Public Improvement PlanNeed Tech SubmTab 13 PIP12/14/2023
Site Plans - Architectural ElevationsNeed Tech SubmTab 12 Architectural Standards12/14/2023
Site Plans - Landscape DetailsNeed Tech SubmTab 11 Landscape Standards12/14/2023
Site Plans - Tree Preservation PlanNeed Tech SubmTab 10 Urban Design Standards12/14/2023
Site Plans - Landscape PlansNeed Tech SubmTab 9 Open Space Circulation12/14/2023
Site Plans - Floor PlansNeed Tech SubmTab 8 Land Use Map12/14/2023
Site Plans - Color and MaterialsNeed Tech SubmTab 7 Public Art Plan12/14/2023
Master Plan - Plan NarrativeNeed Tech SubmTab 6 Master Plan Narrative12/14/2023
Case Files - Applicant Response - Technical Review Comments3Need Tech SubmTab 5 RTC12/14/2023
Case Files - Applicant Response - Technical Review Comments2Need Tech SubmMTIS Comment Response12/14/2023
Site Plan - Site DetailsNeed Tech SubmTab 4 Site Analysis Narrative12/14/2023
Master Plans - cover sheet and engineered site planNeed Tech SubmTab 3 Context Map12/14/2023
Site Plans - Cover Sheet and Engineered Site PlanNeed Tech SubmTab 1 Letter of Introduction12/14/2023
Case Files - 1st Technical Review Comments Need Tech Subm1st Technical Review Comments9/19/2023
Case Files - Response to Pre-app notesNeed Tech SubmMaster Drainage Study Approval Letter9/1/2023
FDPs - Tab14Need Tech SubmTab 14 ALTA Survey9/1/2023
Master Plan - Architectural StandardsNeed Tech SubmTab 12 Architectural Standards9/1/2023
Master Plan - Landscaping StandardsNeed Tech SubmTab 11 Landscape Standards9/1/2023
FDPs - Tab10Need Tech SubmTab 10 Urban Design Standards9/1/2023
Master Plan - Open Space CirculationNeed Tech SubmTab 9 Open Space Circulation9/1/2023
Master Plan - Land Use Map, MatrixNeed Tech SubmTab 8 Land Use Map9/1/2023
Site Plan - Public Art PlanNeed Tech SubmTab 7 Public Art Plan9/1/2023
FDPs - Tab6Need Tech SubmTab 6 Form B Narrative9/1/2023
Case Files - Applicant Response - Technical Review Comments1Need Tech SubmTab 5 RTC9/1/2023
Case Files - Applicant Response - 3rd Review Comments Need Tech SubmTab 5 MUS RTC9/1/2023
Case Files - Applicant Response - 1st Review Comments Need Tech SubmTab 5 TIS RTC9/1/2023
Case Files - CorrespondenceNeed Tech SubmTab 4 Site Analysis Narrative9/1/2023
Master Plan - Context Map and Site AnalysisNeed Tech SubmTab 3 Context Map9/1/2023
Case Files - Letter of Introduction/JustificationNeed Tech SubmTab 1 Letter of Introduction9/1/2023
Case Files - 3rd Review Comments Need Tech Subm3rd Review Comments7/12/2023
Case Files - 2nd Review Comments Need Tech Subm2d Review Comments7/12/2023
Case Files - 1st Review Comments Need Tech Subm1st Review Comments7/12/2023
Case Files - Applicant Response - 2nd Review Comments Need 3rd SubmTIS Comment Response6/16/2023
FDPs - Tab12Need 3rd SubmArchitectural Standards6/16/2023
FDPs - Tab11Need 3rd SubmLandscape Standards6/16/2023
FDPs - Tab9Need 3rd SubmOpen Space and Circulation6/16/2023
FDPs - Tab8Need 3rd SubmLand Use Map6/16/2023
FDPs - Tab7Need 3rd SubmPublic Art Plan6/16/2023
FDPs - Tab2Need 3rd SubmTab 6 Master Plan Narrative6/16/2023
FDPs - Tab5Need 3rd SubmResponse to Comments6/16/2023
FDPs - Tab4Need 3rd SubmExisting Conditions6/16/2023
FDPs - Tab3Need 3rd SubmContext Map6/16/2023
FDPs - Tab1Need 3rd SubmLetter of Introduction6/16/2023